Project Experience > Demolition > Former Coal Distribution Centre
Dismantling and Demolition of Former Coal Distribution Centre

Contract Details

  • Dismantling of extensive high support conveyor systems for eventual recondition and resale.
  • Removal of 4,000 tonnes of railway track/points gidings for reclamation.
  • Strip off cladding (metal sheet) 3 years old for re-use on industrial and agricultural buildings.
  • Demolition of large concrete structures including water storage tank supported at 50 ft height volume 500,000 litres.
  • Demolition of extensive offices, workshops and pit bath buildings.
  • Dig out underground conveyors and storage bunkers and refill with demolition material.
  • 1000 tonnes – underground concrete structures broken to 300mm dia maximum size.
  • Removal of 800 tonnes of contaminated water and material from storage lagoons and disposal in licensed tips 800 tonnes.
  • Regrade site 50 acres in extent.
 
Client – Celtic Energy
Value – £100,000
Duration – 2000