Dismantling and Demolition of Former Coal Distribution Centre |
Contract Details- Dismantling of extensive high support conveyor systems for eventual recondition and resale.
- Removal of 4,000 tonnes of railway track/points gidings for reclamation.
- Strip off cladding (metal sheet) 3 years old for re-use on industrial and agricultural buildings.
- Demolition of large concrete structures including water storage tank supported at 50 ft height volume 500,000 litres.
- Demolition of extensive offices, workshops and pit bath buildings.
- Dig out underground conveyors and storage bunkers and refill with demolition material.
- 1000 tonnes – underground concrete structures broken to 300mm dia maximum size.
- Removal of 800 tonnes of contaminated water and material from storage lagoons and disposal in licensed tips 800 tonnes.
- Regrade site 50 acres in extent.
|