Trecatti Landfill Site Works |
Contract Details- Approx. 120,000m3 of bulk excavation including 15,000m3 or rock and removal of coal measures
- Dredging of existing lagoon and placement of rock fill into lagoon
- Relocation of approx. 40,000m3 of refuse
- Approx. 110,000m2 of geomembrane, 2 layers of geogrid, 2 layers of geotextile and a 600mm thick structural layer
- Approx. 40,000m2 of basal drainage layer
- Construction of leachate pumping station
- Construction of a lower cell providing waste capacity of approx. 2 million m3
- Provision of new lagoon
- Provision of new pumps and pumping station for discharge of clean surface water using a nominated sub-contractor
- Construction of a new access road 7.5m wide and approx. 1200m long and upgrading along a further length of 600m
- New cell comprising 27,000m2 of 2.5m thick HDPE lining with associated stone and geological support layers
- Work predominantly on a 1 : 2.5 side slope with tie ins to previously laid liner
- Associated works included attenuation ponds and drainage
|